Dedications and Ceremonies, 2020-
Scope and Contents
Building and development projects in the 2020s, including the completion of the Greater Zion Stadium in 2022; the groundbreaking for a new general education building; renovation of Smith's Computer Center in 2023; and the ribbon cutting for Campus View Suites III in 2024.
Dates
- Creation: 2020-
Conditions Governing Access
The collection is open and freely available to researchers during Special Collections hours or by appointment. Researchers must complete an Application for Use and show a photo ID prior to accessing materials. Some materials are restricted due to their extreme fragility.
Full Extent
From the Collection: 20 Linear Feet (3 tan banker boxes, 2 gray oversize boxes, 3 gray long oversize boxes, 1 tan 11in x 4.5in x 4.5 in box, and 1 roll)
Language of Materials
From the Collection: English
Physical Description
Program flyers in Box 3; and a commemorative coin, and a small glass bottle with sand from the groundbreaking ceremony for Campus View Suites II (2020-01-31) in Box 9.
Repository Details
Part of the Utah Tech University Special Collections and Archives Repository
330 Holland Centennial Commons
225 South 700 East
Saint George 84770 United States
(435) 634-2087
specialcollections@utahtech.edu